Discharge Permit (DP)

Entities discharging wastewater into water bodies require a DENR Discharge Permit to ensure compliance with environmental standards and prevent pollution.

Discharge Permit (DP)

scope OF WORK - NEW

RESPONSIBILITIES OF THE CONSULTANT
  • Creation of Company Registration System (CRS) and Online Permitting and Monitoring System (OPMS) account if unavailable (See separate file for requirements)
  • Site visitation to assess the project
  • Prepare and Generate the Engineer’s Report
  • Generate duly accomplished and notarized Application Form.
  • Sign and Seal from a Sanitation/Chemical Engineer
  • Consolidation of documents and information needed from the client
  • Consultation with regards their Wastewater Treatment Facility (WTF)
  • Assist on the effluent laboratory testing and provide wastewater characteristic report

REQUIREMENTS - nEW

REQUIREMENT FROM PROPONENT
  • Copy of the Government ID of the Proponent
  • SEC or DTI certificates
  • CRS account and OPMS (If unavailable, see separate file for the requirements)
  • Copy of Environmental Compliance Certificate (ECC), Permit to Operate, and Hazardous Waste Generator ID, Pollution Control Officer (PCO) Accreditation Certificate, whichever is applicable.
  • Copy of the Site Development Map, Wastewater Plan Layout, and the Plan and Elevation of the Wastewater Treatment Facility (WTF)
  • Copy of monthly water consumption bill for the last twelve (12) months or average volumetric abstraction or consumption (in case of deep well, surface water, water outsourcing), whichever is applicable.
  • Assistance During Site Inspections or during conduct of sampling (if applicable)
  • Payment of DP Application Fee
  • Payment of DP Discharge / Load Based Fee
  • Other that may be required by EMB Case Handler.

scope OF WORK - amendment

RESPONSIBILITIES OF THE CONSULTANT
  • Creation of Company Registration System (CRS) and Online Permitting and Monitoring System (OPMS) account if unavailable (See separate file for requirements)
  • Prepare and Generate the Proof of Compliance to Discharge Permit Conditions Document
  • Generate duly accomplished and notarized Application Form.
  • Consolidation of documents and information needed from the client
  • Assist on the effluent laboratory testing and provide wastewater characteristic report

REQUIREMENTS - amendment

REQUIREMENT FROM PROPONENT
  • Copy of the Government ID of the Proponent
  • Copy of the Company ID of the Proponent
  • Copy of Environmental Compliance Certificate (ECC)/Certificate of Non-Coverage
  • Outline and Requirements
  • Notarized Application
  • SEC or DTI Certificate
  • Copy of PCO Accreditation
  • Copy of Water Bill
  • Monthly Abstraction
  • Copy of Hazardous Waste Generator ID
  • Proof of SMR Submissions
  • Module 1 and 3 of SMR
  • Proof of Compliance to Permit Condition
  • Sketch Plan (Signed and Sealed)
  • Wastewater Treatment Facility Plan and Elevation (Signed and Sealed)
  • Memorandum of Agreement (MOA)
  • Certificate of Treatment (COT)
  • Engineer’s Report
  • Other Documents (which may be required by EMB)

scope OF WORK - renewal

RESPONSIBILITIES OF THE CONSULTANT
  • Creation of Company Registration System (CRS) and Online Permitting and Monitoring System (OPMS) account if unavailable (See separate file for requirements)
  • Prepare and Generate the Proof of Compliance to Discharge Permit Conditions Document
  • Generate duly accomplished and notarized Application Form.
  • Consolidation of documents and information needed from the client
  • Assist on the effluent laboratory testing and provide wastewater characteristic report

REQUIREMENTS - renewal

REQUIREMENT FROM PROPONENT
  • Copy of the Government ID of the Proponent (if applicable)
  • CSEC or DTI certificates (if applicable)
  • CRS account and OPMS (If unavailable, see separate file for the requirements)
  • Copy of Environmental Compliance Certificate (ECC), Permit to Operate, and Hazardous Waste Generator ID,Pollution Control Officer (PCO) Accreditation Certificate, whichever is applicable.
  • Copy of previous Discharge Permit (DP) Certificate
  • SGeotagged photos of Wastewater Treatment Facility (WTF)
  • Proof of compliance to DP Conditions
  • Proof of Self-Monitoring Report (SMR) Submission
  • Copy of monthly water consumption bill for the last twelve (12) months or average volumetric abstraction or consumption (in case of deep well, surface water, water outsourcing), whichever is applicable.
  • Assistance During Site Inspections or during conduct of sampling (if applicable)
  • Payment of DP Application Fee
  • Payment of DP Discharge / Load Based Fee
  • Other that may be required by EMB Case Handler.